Home / Process

Four stages.
One calm rhythm.

A predictable, calendarised path from first site visit to handover — and a long-term relationship after.

  1. 01

    Listen & Survey

    A site visit, soil study, and two weeks of conversation. We learn how you actually live — how many people at dinner, who studies where, how the monsoon hits your plot, where the elders prefer to sit in the morning sun. We do not draw a single line until this stage is done.

  2. 02

    Design & Model

    Plans, elevations, sunlight and ventilation studies. We show you three design directions — and kill two of our own favourites together before we move on. By the end of this stage you have a 3D model you can walk through, a finalised footprint, and the elevation locked.

  3. 03

    Engineer & Budget

    Structural drawings, MEP design and a line-by-line costing done by the founder. No surprises after you sign — the number we quote is the number we build to. Approvals coordination starts here so we are ready to break ground the day the contract is signed.

  4. 04

    Build & Hand over

    Self-performed civil, MEP and interior work with weekly photo updates. Every pour is inspected by our structural engineer. Handover includes a 10-year structural warranty, the full document set, and a signed letter from Karthikeyan. We come back yearly after to inspect and touch up.

// Beyond handover

The relationship doesn't end.

10-year structural warranty

Signed by Karthikeyan personally. We stand behind every column, every beam, every slab.

Annual inspections

We come back yearly to inspect, touch up cosmetic items, and catch issues before they become problems.

One direct line

For as long as you own the home, you have Karthikeyan's number. Not a call centre, not a ticket queue.

// Begin Stage 01

Schedule a site visit.

Karthikeyan visits your plot, takes notes, and gives you an honest first read — no commitment.

Book a Site Visit Or send a note →